Applicant Detail
 
Personal Information:
First Name : shaab
Last Name : obeid
Nationality: IRAQ
Date of Birth : 21 - February - 1956
Gender: Male
Martial Status: Married
 
Contact Information:
Address: UAE 
City: Al Sharjah
Province/State: UAE
Country: UNITED-ARAB-EMIRATES
 
CV Details:
Brief Description: Senior Project Engineer
Full CV Description:
Qualifications BSc Civil Engineer with Management Science Professional affiliations Registered Member of Iraqi Engineers Union Country experience Qatar Iraq Nationality & Date Iraqi 21.02.1956 Languages English Arabic Marital: married Curriculum Vitae For Shaab W. Obeid Senior project Engineer Career Highlights  BSc Civil Engineering with Management Science University of Basrah, Iraq 1978 – 1979.  Detailed knowledge of computer presentation (Ms Office).  Knowledgeable / Experienced in Primavera Enterprise.  Detailed knowledge of (Project Management, construction management, GIS, and highways Design).  Certificate of Training in Design Construction & Maintenance of flexible pavement.  Prepare the brief of project Management included the standard construction forms. Detailed Experience April 2003 –Aug. 2007 Senior Project Engineer Ministry of Municipal Affairs & Agriculture Doha Qatar 2001 – March 2003 Head of Wakrah Roads Division Roads Dept. Doha Qatar The Duets of Head is:-  Execute assigned work in accordance with the Project Execution Plan, applicable Project Procedures and Standards, including Project Procedures on Safety and Quality Control.  Review the project execution schedule developed by the Cost and Planning Department and to develop the detailed schedule for Civil Engineering and Design activities.  Responsible for administration and immediate direction of civil engineering and design on a project.  Hold co-ordination meetings with the Construction Department during the design phase and provide assistance to site when requested during the construction phase of a project.  Carry out technical investigations, produce technical reports, engineering standards and procedures.  Prepare the brief and documents for the PSA.  Estimations and analysis of the projects budgets.  Project managements of roads, bridges & tunnels projects, industrial area, Irrigation channels, steel structures, and multiple building structures. Curriculum Vitae Shaab W. Obeid 1999-2001 Area Engineer & project Coordinator Civil Engineering Dept., Doha - Qatar Area Engineer For Qatar South (Wakrah, Mesaieed, Wukair), Salwa Rroad. 1996-1999 Project Coordinator For all roads projects within Qatar South This Project is: - • ERC 1003/SI construction Wakrah Main Road Roundabout Road construction roundabout (86M dia), dual carriageway, including full provision of surface & fuel water drainage, street lighting, Q-Tel, Electricity and Water works and land escaping. • ERC 0215 Reconstruction Road between W11 (Roundabout) and W12 (Roundabout) at Wakrah Reconstruction of this road (1.20KM), dual carriageway including full provision of infrastructures • ERC 0119 Reconstruction of commercial street at the Wakrah Reconstruction the Road (1.30 KM) dual carriageway including full provision of infrastructures. • ERC 0459C1 Link Rd between Abdul Rahman & Wakrah Road Reconstruction the Road (2.60 KM) dual carriageway including full provision of infrastructures. • ERC 0478C1 Link Rd to Ras Abu Fantass Construction the Road (1.90 KM) dual carriageway including full provision of infrastructures. • ERC0430C1 Route 55 Mesaieed Salow Road Construction the Road (4.600 KM) dual carriageway and (26.30 KM) single carriageway, including full provision of infrastructures. Road Improvement works at the Wakrah & Al Wukair` as following:  ERC 395/C1 RIW (Road Improvement Works)  ERA 305/C1 RIW (Road Improvement Works)  ERC 456 RIW (Road Improvement Works)  ERC 431 Earthworks  ERC 407C1 RIW (Wakrah West)  ERA 408C1 RIW Wakrah & Wukair  ERC 409C1 RIW (Wakrah North)  ERC 428C1 RIW (Industrial Area)  ERC 0458 C1 RIW (AlMashaff) Curriculum Vitae Shaab W. Obeid 1988 – 1996 Executive Managers for Al-Fatah (Engr. & Cont. Co.) Executive Manager for the following projects:  Construction of Baijey Railway Station Road  Road and parking construction of industrial club.  Earth work of petrochemical factory / 2 (Construction Management by Bachtel)  Irrigation Channel construction of the Sowara area  Reconstruction of petrol complex at the Kut area  Construction of the electric station at the pajey area  Moved & reconstructed closed bull stadium from Basrah to Nasriyah 1984 – 1988 Resident Engineer  Construction for the Multiple building structure at Baghdad area (concrete works)  Construction for Iron (Steel) structure works in different area of Iraq
 
 
To send Response for this CV Click Here
 
4/26/2009
Bulletin 217
العدد 217 - الأحد 1 ج...
Read More...
 
5/3/2009
Bulletin 218
العدد 218 - الأحد 8 ج...
Read More...
 

Services Overview

All Avaliable CV's

Post CV

All Avaliable Jobs

Post New Job
Applicant Sign Up here
Employer Sign Up here

Login
Search:
Search in Employers
Search in Applicants