Applicant Detail
 
Personal Information:
First Name : Jamal
Last Name : Al taee
Nationality: IRAQ
Date of Birth : 9 - July - 1958
Gender: Male
Martial Status: Married
 
Contact Information:
Address: Al Salam St. 
City: Abu Dhabi
Province/State: Abu Dhabi
Country: UNITED-ARAB-EMIRATES
 
CV Details:
Brief Description: More than 25 years in Civil Eng.
Full CV Description:
Jamal Abbas Redah P.O. Box 8230, Abu Dhabi E-mail : altaee2003@yahoo.com Tel. No. +971 55 9295145 Page1/5 PERSONAL Date of Birth July 9, 1958. Nationality Iraqi. Marital Status Married. Languages Arabic (Mother Tongue) & English. CERTIFICATION B.Sc. degree in Civil Eng./ University of Baghdad. 1980 KEY EXPERIENCE 26 years experience of construction & consultation in civil engineering fields, site engineer, senior civil engineer, quantities surveyor & costs estimator, constructions manager, projects manager, local contractor. Good experience in projects management, planning & coordination. Experienced in tendering & preparing contractual documents. 3 years as an Academic Lecturer for trainees in civil engineering fields. PROFESSIONAL EXPERIENCE SECG – NEDECO j.v. Company – Iraq Mar 2004 - Dec 2006 • Baghdad Loop Line Railway Route Project / Technical Manager & Consultancy services: 150 Km long main railway route around Baghdad City, 80 Km of secondary routes and Main Complex Bldgs in Baghdad Central Station (B+G+P+4+R+2concrete control Towers + 10 Platforms), 300000 m2 total area, 15 Bldgs for sub-stations along the route(each one includes B+G+P+2+R+steel tower + 4 Platforms), 50000 m2 each, Central Complex Station for Maintenance & International shipping (250000 m2), 5 Bridges crossing rivers. Cost of Project $10,000,000.00 • Railway Stations Buildings Rehabilitations Project / Construction Manager: 10 Stations on the route between Baghdad & Babylon City, (B+G+2+R+Control Tower+ 6Platforms, 50000m2 each). Cost of Project $4,500,000.00 DUTIES & RESPOSIBILITIES Managing and Supervising all engineers groups. Reviewing & rechecking all the documents & drawings. Supervising the surveyors' teams & coordinating their results with the designers. Checking weekly reports for all work activities. Managing and supervising all contractors' works through specialized site engineers. Making any necessary amendments according to requirements of each site. Approving all contractors' works and payments. Jamal Abbas Redah P.O. Box 8230, Abu Dhabi E-mail : altaee2003@yahoo.com Tel. No. +971 55 9295145 Page2/5 Libyan Railways Authority – Libya Sep 2002 – Jan 2004 • Tripoli – Zawia Railway Route Project / Senior Civil Engineer: 75 Km long route, 5 Million m3 soil works, full surveying works, quantities estimations, 1 Million m3 reinforced concrete works for archways & protective sloped sides. Cost of Project $5,000,000.00 DUTIES & RESPOSIBILITIES Head of site team. Checking the surveying works & soil tests results. Supervising & controlling all the work activities. Re-calculating quantities & slopes for cross-sections along the route by using ACAD. Preparing weekly progress reports & monthly payments. Al-Taαwun Company for construction – Libya Sep 1999 – Aug 2002 • Housing Units Buildings Project / Project Manager: 12 Blocks (B+G+8+R), 27000m2 each, roads, car parks, school, clinic, water & sewage systems, Anjela Municipality, Tripoli City. Cost of Project $3,000,000.00 • Medical Center Project / Project Manager: One block (B+G+3+R), 50000m2, roads, car parks, water & sewage systems, Janzoor Municipality, Tripoli City, Project Manager. Cost of Project $1,500,000.00 • (Aziziyah – Zahrah) Road Project / Project Manager: 120 Km long road, 1.5 Million m3 soil works, full surveying works, 75000m3 reinforced concrete works for archways , 1Million m2 of asphalt works, Zahrah City. Cost of Project $4,000,000.00 • VIP Guest House Project / Project Manager: Special designed house (B+G+2+R), 10000m2, roads, car parks, swimming pool, indoor sports halls, Tripoli City. Cost of Project $2,000,000.00 DUTIES & RESPOSIBILITIES Managing and controlling all the sites teams. Coordinating the activities between the projects. Reviewing & rechecking the drawings & making the necessary amendments. Checking & Re-calculating quantities by using ACAD. Approving weekly progress reports & monthly payments. Jamal Abbas Redah P.O. Box 8230, Abu Dhabi E-mail : altaee2003@yahoo.com Tel. No. +971 55 9295145 Page3/5 Ministry of Education – Libya Feb 1996 – Aug 1999 • Tripoli Institute for Building & Construction Engineering / Academic Lecturer: Professional Academic Institute in Civil Engineering Fields – Diploma Degree, Tripoli City. DUTIES & RESPOSIBILITIES Teaching the trainees all about the civil engineering equipments, land surveying, planning of projects, quantities & costs estimates, time schedules ....etc. Conducting the needed exams and approving the outcomes. Private Contractor (as a member in Federation of Iraqi Contractors) – Iraq Mar 1993 – Sep 1995 • Executing many private housing buildings, roads, water systems networks, surveying works ...etc. DUTIES & RESPOSIBILITIES Managing & supervising all works. Reviewing & checking all the drawings and sketches. Preparing all needed documents. Ensuring the necessary abilities for all engineers and workers in site. Controlling all technical & administrative activities. Establishment of projects execution / Ministry of Industry – Iraq Aug 1990 – Feb 1993 • Prefabricated Furniture Factory Project / Senior Civil Engineer: Complete Compound consists of many buildings, workshops & warehouses for prefabricated furniture factory over an area of 40000m2, roads, sub-ways, car parks, dwelling houses units for the employees, full network for water & sewage systems, Taji Zone/Baghdad City. Cost of Project $5,750,000.00 DUTIES & RESPOSIBILITIES Head of site team. Supervising all works & coordinating the different activities. Reviewing & rechecking the drawings & site sketches. Reviewing & rechecking bill of quantities & costs estimations. Preparing progress reports & monthly payments. Preparing & reviewing the Interim Certificates for the Contractors. Jamal Abbas Redah P.O. Box 8230, Abu Dhabi E-mail : altaee2003@yahoo.com Tel. No. +971 55 9295145 Page4/5 Al-Rasheed Company / Ministry of housing & construction – Iraq Apr 1987 – May 1990 • Central Courts Complex Project / Site Engineer: Main Court Building (B+P+G+3+R), 20000m2, 2 blocks of housing units buildings for officers & employees (B+G+6+R), 12000m2 each, jails, sub-ways, car parks, water & sewage systems, Baghdad City. Cost of Project $4,000,000.00 DUTIES & RESPOSIBILITIES Checking drawings and supervising on-site works. Preparing daily reports for each work item. Reviewing bill of quantities & costs. Checking the lab record regarding the test of each material before using. General Establishment for Executing Military projects / Ministry of Defense – Iraq Apr 1984 – Mar 1987 • Many projects ( as military service) / Site Engineer: Surveying, Buildings, roads, shelters, warehouses, water treatment plants, concrete & steel towers, concrete storage tanks ....etc. DUTIES & RESPOSIBILITIES Supervising on-site works. Reviewing & checking drawings. Preparing bill of quantities & costs estimations. Preparing time schedules for works progress. Thyssen Company (German Company) / Ministry of housing & construction – Iraq Apr 1982 – Mar 1984 • Al Masbah VIP Guest House Project / Site Engineer: Special designed guesthouse (B+G+2+R), 12000m2, subways, car parks, swimming pool, indoor sports halls, and boats anchorage with concrete retaining wall, Al Masbah / Baghdad City. Cost of Project $1,000,000.00 • Al Jadriyah VIP Guest House Project / Site Engineer: Special designed guesthouse (B+G+2+R), 12000m2, subways, car parks, swimming pool, indoor sports halls, and boats anchorage with concrete retaining wall, Al Jadriyah / Baghdad City. Cost of Project $1,000,000.00 DUTIES & RESPOSIBILITIES Working with the resident engineer office (as a member of the team). Reviewing the drawings and checking the works on-site. Reviewing & approving progress reports. Checking & approving the contractor payments. Following on & ensuring the acceptable results for all tests of the used materials. Providing the daily & weekly reports for the resident engineer. Jamal Abbas Redah P.O. Box 8230, Abu Dhabi E-mail : altaee2003@yahoo.com Tel. No. +971 55 9295145 Page5/5 Skanska Company (Swedish company) / Ministry of housing & construction – Iraq Aug 1980 – Mar 1982 • Al Rasheed Hotel Project / Site Engineer: Five-Stars Hotel (2B+G+2P+20), 100000m2, dwelling houses buildings units for the employees, swimming pools, sports halls, subways, Baghdad City. Cost of Project $5,000,000.00 DUTIES & RESPOSIBILITIES Working with the resident engineer office (as a member of the team). Reviewing the drawings and checking the works on-site. Reviewing & approving progress reports. Checking & approving the contractor payments. Following on & ensuring the acceptable results for all tests of the used materials. Providing the daily & weekly reports for the resident engineer. COMPUTER SKILLS Extensive Experience in Microsoft Office (Excel, Word, Power Point). Experienced in Using Auto CAD. Fair in using Microsoft Project. MEMBERSHIPS Iraqi Engineers Union, Iraq, 1980. Federation of Iraqi Contractors, Iraq, 1993.
 
 
To send Response for this CV Click Here
 
4/26/2009
Bulletin 217
العدد 217 - الأحد 1 ج...
Read More...
 
5/3/2009
Bulletin 218
العدد 218 - الأحد 8 ج...
Read More...
 

Services Overview

All Avaliable CV's

Post CV

All Avaliable Jobs

Post New Job
Applicant Sign Up here
Employer Sign Up here

Login
Search:
Search in Employers
Search in Applicants